
Solutions for Scaffolding Trade
PERI systems and services for scaffolding trade
The PERI UP Scaffolding Kit adapted perfectly to suit the structural conditions and static requirements involved in scaffolding and enclosing a cultural monument. This accelerated the assembly operations and increased safety levels during the renovation work.
In Waregem, a comprehensive project has been implemented that brings together living, working, hotel stays and recreation. After completion of the first phase – an office complex – the two residential towers Ascot and Windsor formed the second construction phase together with a 72-room hotel. The 45-m-high, 13-storey towers house a total of 120 flats.
When completed, the Foreign Ministry Quarter will grace the western entrance to Jerusalem. The architecturally diverse buildings demanded adaptability – child’s play for PERI UP.
Uninterrupted travel thanks to intelligent connections: At the Heiligenborn railway viaduct, the PERI UP and VARIOKIT systems ensured that train services continued to run despite extensive refurbishment work.
One of the deepest diving pools in the world was built with the aid of numerous PERI systems near the Polish capital of Warsaw.
Thanks to PERI’s weather protection solution, it was possible to renovate the “Gurrehus” in northern Denmark within a single calendar year without any weather-related interruptions. Other components in the PERI UP Scaffolding Kit were also used.
Large construction projects should interrupt traffic flows and business operations as little as possible. In downtown Ulm, scaffolding work in line with the construction progress was successfully carried out with the PERI UP Scaffolding Kit over 10 floors without any complicated conversion work. The planned time frame and budget were comfortably complied with.
PERI systems and services for scaffolding trade